Facility summary
Key future considerations
- Very well-maintained facilities.
- Leisure water in need of modernisation.
- Mid-range catchment size.
- Visitor draw is diverse, including 6.3% of visitors coming from the Edmonton area.
- Above average annual visitation, however, catchment multiple is lower than the majority of other pools in the network.
- Below average annual visitation and catchment multiple.
Planned works and project timeline
This is a medium-term project, currently scheduled to be completed by 2031.
The project is subject to funding availability and includes the following works:
- Replace leisure pool with a water play park
- Increase shade cover over 50m pool
- New universal change cubicle in 25m pool area