Woree Sports and Aquatic Centre

Facility summary

Key future considerations

  • Very well-maintained facilities.
  • Leisure water in need of modernisation.
  • Mid-range catchment size.
  • Visitor draw is diverse, including 6.3% of visitors coming from the Edmonton area.
  • Above average annual visitation, however, catchment multiple is lower than the majority of other pools in the network.
  • Below average annual visitation and catchment multiple.

Planned works and project timeline

This is a medium-term project, currently scheduled to be completed by 2031.

The project is subject to funding availability and includes the following works:

  • Replace leisure pool with a water play park
  • Increase shade cover over 50m pool
  • New universal change cubicle in 25m pool area