Facility summary
Key future considerations
- Well-maintained.
- Leisure water in need of modernisation.
- Opportunity to improve cover and amenities for the program pool.
- Mid-range catchment.
- Visitor-draw is diverse, with the area attracting visitors from Redlynch and the northern beaches.
- Generating the highest catchment multiple performance of all aquatic centres in the network, with the exception of Babinda (noting Babinda only generates 3,922 annual visits).
- After Tobruk, Smithfield has the lowest cost per visit within the network.
Planned works
The improvements to Smithfield Pool are classed as a medium-term project, currently scheduled to be completed by 2031.
The project is subject to funding availability and includes the following works:
- Replace leisure pool with a water play park
- Increase shade cover over 50m pool
- New universal change cubicle in 25m pool